Skip to main content
Close Search
Siegfried Engineering
search
Menu
  • Legacy
    • About
    • History
    • People
    • Culture
    • Awards
  • Expertise
    • Civil Engineering
    • Structural Engineering
    • Geotechnical Engineering
    • Landscape Architecture
    • Surveying
    • Partnering & Public Outreach
  • Projects
    • Education
    • Healthcare
    • Industrial & Manufacturing
    • Infrastructure & Transportation
    • Civic
    • Parks & Open Spaces
    • Athletic Facilities
    • Residential
    • Retail & Hospitality
    • Stormwater & Pipelines
  • Careers
    • Employment
    • Internships
  • Insights
  • Connect
  • search

South San Francisco Unified School District Projects

SSFUSD
SSFUSD

SSFUSD

South San Francisco Unified School District SSFUSD Athletic Track
South San Francisco Unified School District SSFUSD Athletic Track

South San Francisco Unified School District SSFUSD Athletic Track

SSFHS
SSFHS

SSFHS


Project Type:

Education Athletic Facilities

The South San Francisco Unified School District project consisted of complete master planning, construction documentation, and construction administration services for two high school stadium projects: El Camino High School (ECHS) and South Francisco High School (SSFHS).

In Phase 1 of the ECHS and SSFHS projects, the stadiums were completed in 2014 through the lease-leaseback delivery method. Phase 1 for both schools included the demolition of the existing stadiums and renovation to include new home and visitor bleachers, all-weather tracks, athletic field lighting, ticket booths, pedestrian access, drainage, irrigation, planting, and new synthetic turf fields. Phase 2 for each school includes the installation of support buildings including restroom and concession buildings, along with new team rooms and storage.

In regards to the South San Francisco High School stadium, Siegfried was able to build a larger capacity stadium that would allow the school to host larger events, as well as adhere to the necessary ADA requirements, due to the existing bowl configuration. This renovation received a NFL grant in order to fund a portion of the project.

For El Camino High School, Siegfried designed the stadium to be a premier, invitational track facility that consists of eight lanes, as opposed to the traditional six.

  • Athletic Facility Design
  • Landscape Architecture
Stockton – Corporate
3428 Brookside Road
Stockton, CA 95219
209.943.2021 – Office
209.942.0214 – Fax
Modesto
100 Sycamore Avenue, Suite 100
Modesto, CA 95354
209.762.3580
Sacramento
1164 National Drive, Suite 20
Sacramento, CA 95834
916.520.2777
San Jose
84 W. Santa Clara Street, Suite 700
San Jose, CA 95113
408.754.2021
Discipline Icons
© 2025 Siegfried Engineering. All Rights Reserved.
Privacy Policy
Share
Share Share
Close Menu
  • Legacy
    • About
    • History
    • People
    • Culture
    • Awards
  • Expertise
    • Civil Engineering
    • Structural Engineering
    • Geotechnical Engineering
    • Landscape Architecture
    • Surveying
    • Partnering & Public Outreach
  • Projects
    • Education
    • Healthcare
    • Industrial & Manufacturing
    • Infrastructure & Transportation
    • Civic
    • Parks & Open Spaces
    • Athletic Facilities
    • Residential
    • Retail & Hospitality
    • Stormwater & Pipelines
  • Careers
    • Employment
    • Internships
  • Insights
  • Connect