Skip to main content
Close Search
Siegfried Engineering
search
Menu
  • Legacy
    • About
    • History
    • People
    • Culture
    • Awards
  • Expertise
    • Civil Engineering
    • Structural Engineering
    • Geotechnical Engineering
    • Landscape Architecture
    • Surveying
    • Partnering & Public Outreach
  • Projects
    • Education
    • Healthcare
    • Industrial & Manufacturing
    • Infrastructure & Transportation
    • Civic
    • Parks & Open Spaces
    • Athletic Facilities
    • Residential
    • Retail & Hospitality
    • Stormwater & Pipelines
  • Careers
    • Employment
    • Internships
  • Insights
  • Connect
  • search

San Joaquin RTD Downtown Transit Center

RTD Stockton CA
RTD Stockton CA
Transit Hub Stockton CA
Transit Hub Stockton CA
San Joaquin Regional Transit District RTD
San Joaquin Regional Transit District RTD
RTD Stockton CA
RTD Stockton CA
San Joaquin Regional Transit District
San Joaquin Regional Transit District
Weber-Avenue-54
Weber-Avenue-54

Project Type:

Infrastructure & Transportation

Siegfried provided civil engineering, structural engineering, and surveying services for the development of the 48,000 SF, $45 million dollar RTD transit center located in Downtown Stockton, CA. The project consisted of restoring a series of historical buildings, upgrading the site infrastructure, and improving the four streets surrounding the project. Siegfried prepared the project on-site and off-site improvements and technical specifications including a site demolition plan, drainage and grading plan, and improvement plans for streets, curbs, gutters, sidewalk, lights, planters, parking lot, striping, traffic signage, pavement, outdoor passenger terminal, and permanent fencing. Siegfried also prepared an erosion control plan, and an underground wet utilities plan including storm drainage, sanitary sewer, and a water main including service laterals and connections to adjacent off-site wet utility trunk lines. The on-site improvements consisted of entirely new bus transfer facilities with large pick-up and drop-off canopies. Siegfried, working under the design-build delivery method entered the project at the Design Development stage. The previous schematic design drawings and project documents had been prepared based on Siegfried’s topographic survey of the site.

  • Civil Engineering
  • Structural Engineering
  • Surveying
Stockton – Corporate
3428 Brookside Road
Stockton, CA 95219
209.943.2021 – Office
209.942.0214 – Fax
Modesto
100 Sycamore Avenue, Suite 100
Modesto, CA 95354
209.762.3580
Sacramento
1164 National Drive, Suite 20
Sacramento, CA 95834
916.520.2777
San Jose
84 W. Santa Clara Street, Suite 700
San Jose, CA 95113
408.754.2021
Discipline Icons
© 2025 Siegfried Engineering. All Rights Reserved.
Privacy Policy
Share
Share Share
Close Menu
  • Legacy
    • About
    • History
    • People
    • Culture
    • Awards
  • Expertise
    • Civil Engineering
    • Structural Engineering
    • Geotechnical Engineering
    • Landscape Architecture
    • Surveying
    • Partnering & Public Outreach
  • Projects
    • Education
    • Healthcare
    • Industrial & Manufacturing
    • Infrastructure & Transportation
    • Civic
    • Parks & Open Spaces
    • Athletic Facilities
    • Residential
    • Retail & Hospitality
    • Stormwater & Pipelines
  • Careers
    • Employment
    • Internships
  • Insights
  • Connect