Siegfried provided landscape architecture, surveying, and civil engineering services for this five (5) acre, $179M WTP Water Treatment Plant, Reliability Improvement project located in the Santa Clara Valley Water District. The new landscape areas of focus included several entry-gate areas, landscape areas adjacent to the flocculation and sedimentation basins, and filter buildings. It also includes the staff courtyard landscaped shade and seating area. Our design principle for this project was to provide effective screening within a few years as well as into the future, without obstructing the neighbor’s distant views of the valley. Our technical mandate was to comply with the project Environmental Impact Report (EIR) and MMRP.
- Civil Engineering
- Landscape Architecture
- Surveying