In support of the existing Dameron Hospital Building Complex, a new 16,293 square foot central plant facility was constructed to replace the undersized 40-year-old central plant. Siegfried worked closely with OSHPD/HCAI to provide engineering support for the new $3,000,000 plant, which included new utility corridors, boilers, central chillers, medical gas distribution systems, vacuum systems, electrical equipment and emergency generators for the entire hospital facility.
Photos provided by Champion Industrial Contractors, Inc.
- Civil Engineering
- Structural Engineering
- Surveying